CASE STUDY: PILING, ARMSTRONG CONSTRUCTION


Project: Timber frame residential apartments
Location: Hull City Centre
Client: Armstrong Construction

Download a PDF version of this case study

Project Overview

As the development had a city centre location, providing car parking was going to be imperative to selling the apartments. With this in mind Armstrong Construction had designed a basement car park as part of the project.

The apartment building itself was a three storey timber frame design, set to be the highest timber frame building in Yorkshire.

The location was a bit of a challenge with it being city centre, in fact just opposite the police station. But we made sure we designed with the correct rig in mind, which was capable of work within the tight access conditions.

Result

We carried out some further site investigations, using our in-house SI team. This allowed us to produce a cost effective solution suitable for the conditions and ensured the job wasn't faced with any unexpected problems. Combining this with utilising the best rigs for the job ensured the programme ran smoothly and was managed efficiently.

The programme was completed seven days ahead of schedule, saving our client both time and money and the Police any unnecessary congestion.

Technical Information

We installed 204 No contiguous piles to 13.5m deep, 58 No bearing piles to 18m deep.
Rig: Llamada 130

Hull
Hull

Hull

Hull
Stability for Life Follow UsFacebook  Twitter  LinkedIn

Van Elle Ltd | Kirkby Lane | Pinxton | Notts | NG16 6JA | Company Registration No. 2590521 | VAT No. 706373736

Site Last Updated: 16/04/2012 | Contact Us | Privacy Policy | Site Map | Copyright © Van Elle Ltd 1984 - 2012