CASE STUDY: PILING, ARMSTRONG CONSTRUCTION
Project: Timber frame residential apartments
Location: Hull City Centre
Client: Armstrong Construction
Project Overview
As the development had a city centre location, providing car parking was going to be imperative to selling the apartments. With this in mind Armstrong Construction had designed a basement car park as part of the project.
The apartment building itself was a three storey timber frame design, set to be the highest timber frame building in Yorkshire.
The location was a bit of a challenge with it being city centre, in fact just opposite the police station. But we made sure we designed with the correct rig in mind, which was capable of work within the tight access conditions.
We carried out some further site investigations, using our in-house SI team. This allowed us to produce a cost effective solution suitable for the conditions and ensured the job wasn't faced with any unexpected problems. Combining this with utilising the best rigs for the job ensured the programme ran smoothly and was managed efficiently.
The programme was completed seven days ahead of schedule, saving our client both time and money and the Police any unnecessary congestion.
We installed 204 No contiguous piles to 13.5m deep, 58 No bearing piles to 18m deep.
Rig: Llamada 130