Junttan PM20 Rig

The Junttan PM 20 is a compact piling rig for pile driving timber, steel and concrete piles. It is an excellent combination of lightweight construction and has the capacity for heavy duty pile driving. The recommended hammer weight is from 4,000 to 5,000 kg and the maximum pile length is 20 meters (65 5/8 ft). The rig has proven productivity due to excellent mobility. The telescopic leader ensures easy and fast handling of piles.

This Junttan piling rig has the same proven features as the bigger Junttan machines. Its rugged design makes it a safe and reliable rig even in the most demanding working conditions. The self-erecting leader and many advanced technical features ensure that the rig is ready to work in just a few minutes. The expandable tracks and low centre of gravity make the rig exceptionally stable in different working situations. The horizontal movement of the leader ensures fast spotting of the pile. Because of the lightweight construction and size, the rig can be easily transported to new working sites.

Junttan PM20

Contact Information

Email: Phil Carr
Call: 0845 630 8993

Downloads

Download the Junttan PM20 Technical Datasheet
NCE1002018 GEAwards2018 SpecialistsAwards2018 CNAwards2018

Terms of Use | Privacy Policy
Copyright 2014 Van Elle Limited. Registration No:2590521. Registered Office: Kirkby Lane, Pinxton, Nottinghamshire, NG16 6JA. Registered in England.

QCA