Case Studies

Van Elle Case Studies

Project NameTechnique(s)Client
Kettering / Market HarboroughRail/STRATANetwork Rail and SPL
Newington, KentRailBalfour Beatty & Network Rail
Cattle Creep, LeicestershireRailAmco
Welwyn Garden CityGround ImprovementDynamic Ground Solutions
Viadux, ManchesterSpecialist PilingDomis Construction
Gatwick Airport, West SussexSpecialist PilingCostain & Network Rail
Barrow-upon-Soar, LeicesterSmartfootDavid Wilson Homes
River wall replacement scheme, LondonRotary bored pilingJackson Civil Engineering
Don Viaduct Bridge Strengthening - AberdeenCFA Piling, Track RRV (Drilling and Civils)BAM Nuttal
Eden Brows, ArmathwaiteDrilled PilingNetwork Rail
The Edge 2, Housing Development, Hempstead, PeterboroughVeMech Piling / SmartfootPersimmon Homes
Falkland's Offshore Dolphin PlatformsDrilled pilingNoble Energy
Fort Kinnaird, EdinburghDrilled Piling RailNetwork Rail
Gospel Oak to Barking electrificationPilingNetwork Rail
Grenadier House, WestminsterPiling, Contiguous Piled WallCarey London Ltd.
Walsall to Rugeley Electrification ProjectGround investigationABC Electrification Ltd
Port of Tyne, Mooring bollardsRotary bored piling, ground anchorsEsh Group
Portland Green Student Accommodation BlocksCFA Piling, groutingMetnor, Patrick Parsons
Thames Tideway Cased PilingCased PilingThames Tideway
New apartment block, Sparkbrook, BirminghamCFA PilingKeepmoat Regeneration
Stockley FlyoverSheet pilingNetwork Rail
Stoke Bardolph WWTW, NottinghamPilingSevern Trent Water
West Coast Main Line (WCML) Concrete Sleeper Facility - BescotGround Investigation (Vetrak®)Buckingham Group c/o Rail One AG
2017 - M6 Smart Motorway M42 JunctionHighwaysBBV JV on behalf of Highways England
2017 - Ely Southern BypassHighwaysVolker Fitzpatrick
2018 -M23 Smart Motorways Project Junctions 8-10HighwaysKier
Formby SmartfootHousingDavid Wilson Homes
SSTC3 - Sunderland Strategic Corridor Phase 3Vibro PilingESH Civils partnered
Swindon Distribution CentrePilingThe Buckingham Group Contracting
Swindon Highways ProjectHighwaysAlun Griffiths

Rig Data Sheets

Vehicle NameTechnique(s)
Casagrande C6Grouting
Colmar T10000FSCGRail
GP D1004Piling
Hütte HBR203Piling
Hütte HBR205MPPiling
Hütte HBR207MPPiling
Junttan PM16Driven Piling
Junttan PM20Driven Piling
Junttan PMX22Driven Piling
Klemm KR702Piling
Klemm KR708-2Piling
Klemm KR708Piling
Klemm KR709Piling
Klemm KR709-2Piling
Llamada P105TTPiling
Llamada P130TTPiling
Llamada P135EVPiling
Llamada P140TTPiling
Llamada P160TTPiling
MAT-HP-15Grouting
Soilmec CM48Piling
Soilmec CM70Piling
Soilmec R312Piling
Soilmec R625Piling
Soilmec SF50Piling
Soilmec SM400Grouting
Soilmec SM401Piling
Soilmec SR30Piling
Soilmec SR75Piling
Soilmec SR95Piling
Soilmec STM20Piling
Unwin Super KittenPiling
VeMOGGround Investigation
VeMechDriven Piling
VetrackGround Investigation
Vermeer HL1800Driven Piling